Robot Integration Project: 8 Steps from First Call to Production

Knowing the steps helps you prepare data and avoid delays.

1. Requirements

Share part drawings, volumes and quality targets.

2. Process study

We analyse the process, cycle time and options such as robot brand and gripper.

3. Concept and layout

We deliver a cell layout, simulation and an estimate of cycle time.

4. Quotation and contract

Scope, timeline, acceptance tests and price are agreed.

5. Design and build

Mechanical, electrical and software design, followed by fabrication of fixtures, guarding and controls.

6. Factory acceptance test

The cell is tested with your parts and adjusted.

7. Installation and commissioning

On-site installation, calibration, safety check and production ramp-up.

8. Training and support

Operator and maintenance training, documentation and 7x24 technical support.